Beaverton Kitchen

Project Details

Design Time: 10 Weeks
Production Time: 6 Weeks
Total Cost: $ 55,000

After many years in this home, these homeowners decided it was time for an overhaul. As avid cooks and wine enthusiasts they love to entertain and wanted a space that would be more open and inviting. Our challenge in this re-design was to find room for their large, full-height wine refrigerator without compromising function in this relatively small kitchen footprint. Once we removed walls to a built-in pantry closet and a never-used nook area, we were able to carve out just enough space. Cabinetry above the dated peninsula was eliminated so the space was more open to the living area. Consequently, the living area was also updated with new entertainment center cabinetry and a fresh coat of taupe glaze on the existing diagonal wall paneling.