Lake Oswego Kitchen

Project Details

Design Time: 8 Weeks
Production Time: 7 Weeks
Total Cost: $ 84,000

This kitchen was in need of more space.  The original design created tight traffic patterns, oversized breakfast nook, and a pantry across from everything.  We were able to fix this with a complete re-design.  In order to gain more space, we had to remove their powder room and load bearing walls.  These clients have a larger picture in which they will be adding back in the bath in a future remodel.  Not only did this project involve all new finishes such as cabinets, counters, appliances, tile, lighting, beautiful hardwood floors throughout, but also involved framing a large beam to create the open concept desired.  This is a truly beautiful Kitchen!