Project Details
Design Time: 8 weeks
Production Time: 7 weeks
Total Cost: $ 60K-75K
The clients wanted to increase the functionality of their kitchen with new storage solutions to help keep things organized and reduce visual clutter. We were able to open up the space and make room for additional cabinets by relocating the refrigerator from the tight hallway area to the central kitchen area.
On the design side, the clients wanted the space to feel light and airy. They also liked the idea of two-tone cabinets with a contrasting countertop.
One of the major challenges was reconfiguring the walls and dining room doorway to accommodate new refrigerator location. We were left with a shallow gap leftover from the transition, which ended up becoming a phone charging area with a magnetic whiteboard (perfect for showcasing the kids' artwork!).